YearCountryProjectCapacityTechnology
2007UkraineSeawater desalination for a recreation center, Cape Tarkhankut, Crimea12 m³/dayReverse osmosis
2008UkraineEstuary-water desalination for a village drinking supply, Hadzhibey50 m³/dayReverse osmosis
2008UkraineDrinking-water preparation design, Bolgrad4,800 m³/dayUltrafiltration
2009UkraineLake Sasyk desalination for recreation centers, Katranka50 m³/dayUltrafiltration + RO
2009UkraineLake Jansheyskoe desalination, Rosseyka50 m³/dayUltrafiltration + RO
2010RussiaWell-water purification & desalination design, “Raspadskaya” mine, Kuzbass28,800 m³/dayUltrafiltration + RO
2010GeorgiaWell-water desalination for a poultry plant, Tbilisi500 m³/dayReverse osmosis
2010UkraineReconstruction of urban treatment facilities, Akhtyrka3,500 m³/dayProcess equipment
2010UkraineReconstruction of biological treatment facilities, Uman10,000 m³/dayProcess equipment
2011–15UkraineMunicipal WWTP design, Malaya Danilovka2,500 m³/dayProcess equipment
2012UkraineSurface-water purification for galvanized-sheet production, Alchevsk240 m³/dayUltrafiltration
2012UkraineIndustrial WWTP, “Mayola”, Stavchany470 m³/dayPhysical & biological treatment
2013UkraineProcess equipment for a mechanical treatment unit, Kolomiya5,000 m³/dayProcess equipment
2013UkraineReconstruction of a WWTP, Energodar50,000 m³/dayIntegrated design & reconstruction
2014UkraineCirculating-water purification design, PJSC “Nikopol Ferroalloy Plant”10,000 m³/dayUltrafiltration + RO
2014UkraineIndustrial WWTP construction, TM “Korolevskiy Smak”, Viasovka240 m³/dayWastewater treatment
2015UkraineDairy-plant wastewater treatment, TM “Slavia”, Akhtyrka500 m³/dayWastewater treatment
2016UkraineTreatment facilities, Melitopol oil-extraction plant500 m³/dayDesign, supply & start-up
2016UkraineTreatment facilities, Karavan settlement, Kharkiv region2,500 m³/dayDesign & equipment delivery
2020Black Sea coastSeawater desalination for drinking-water supply2,400 m³/dayUltrafiltration + RO
UkraineLandfill leachate treatment170 m³/dayTwo-stage reverse osmosis
Containerized mine-water treatment station12,000 m³/dayUltrafiltration + RO, 9×40′ containers

Figures reflect design or contracted capacity at the time of each project.

On site

Photographs from delivered projects

Have a water treatment challenge?

Send us your source-water analysis and target output — we’ll propose the right technology and equipment package.

Start a conversation